Descargar Imprimir esta página

Adeo Group MC01 Instrucciones De Montaje página 3

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 7
Installation guide
Step 2:
Hang the mirror cabinet (A) on the row hook. Make sure the nails on the back are putting through
the three holes on the hook(B) correspondently.
C
x5
D
x5
Drill the screw trough the screw hold on the bottom bracket of the mirror cabinet(A).
Step 3:
Decide the shelf height and insert the shelf bracket (G) into the prefabricated holes.
G
x8
ENGLISH
3
Installation guide
Step 4:
Rest each shelf board (E) steadily onto the four symmetrical shelf bracket (G).
E
x2
Max Weight on each shelf 5KG: Please do not exceed the Max Weight.
Step 5:
Insert (F) into the remaining holes for a neat looking.
Schritt 1:
F
x8
ENGLISH
4

Publicidad

loading

Este manual también es adecuado para:

Umc01