Phlliips #2 screwdriver and an adjustablewrench,
W.'I ;| _II _[_ rmlU_WmBumm
I
Excessive Weight Hazard
Use two or more people when moving the wine
cooler,
1. Unplug the wine cooler and lay the uniton its back.
2. Unscrew the two Leveling Lags; one from the
bottom hinge on rightand one from the left side of the
unit (see Fig. 3 and Fig. 4 for locations).
3. Remove the bottom hinge by unscrewing itsthree (3)
screws (Fig, 2),
NOTE; Keep this hinge tn a safe place incase
you need to return to a right hand door swing,,
4, Carefully remove the door and set aside by sliding
it downward off of the top hinge pin,
5, Remove the two (2) plastic screwcaps rocatad on top
of the hinge cover (Fig. 1).
6, Remove the top hinge cover by removing its two (2)
screws (Fig, 1).
7o Remove the top hinge by unscrewing its three (3)
screws (Fig. 1)
8, Remove the plasUo door p(ncap from the top left
side of the door and transfer it to the right side of the
door,
9, Remove the three (3) Plastic Screw Caps from the
lop left, side of the cabinet and transfer them to the
top right side of the cabinet (Fig.6),
10. Install the top hinge on the left side of the unit and
secure with three (3) screws. (Fig, 1)
11. Install the hinge cover back on the top hinge and
secure with two (2) screws, (Fig. t)
12. instalt the two (2) plastic screw caps on the hinge
cover,_ (Fig. 1)
13, Carefully install the door on the cabinet (Insert upper
door into top hinge pin),
14. Using the left-side bottom hinge supplied with your
unit (FlgoS):Insert the hinge pin Into the bottom of the
door, then align the holes in the hinge with the holes
in the cabinet and secure hinge to cabinet with three
(3) screws°
15. lnsta!l the LevelingLeg formedy attached to the
right bottom hinge(Flgo4)onto the new left bottom
hinge, and installthe Leveling Leg from the former
left side position into the dght side position (Fig.3),
16, Check door aflgnment, door seal and ensure the door
lock slides comfortably Into the lock chamber, Tighten
al! hinge screws,
Allow the unit to stand upright for at-least 1 hour
before putting the unit into operation,
Fig.6
Plastic Screw Ca
Fig,1
Top Hinge
Assembly
og
Fig° 2
Right Bottom
Hinge Assembly
¸
Flg,5
!
J
Left Boftom
Hinge Assembly ............
Flgo4
8
LevelingLeg for Bottom Hinge