Descargar Imprimir esta página

Goodwe GMK120 Guía De Instalación Rápida página 105

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 29
Quick Installation Guide V1.0 -2022 -11-30
GM330
• Recommended cross-sectional area of the smart meter input power cable:
1mm
(18AWG).
2
• Customers need to prepare CT and CT cables. Recommended cross-sectional area of the
CT cable: 1.6mm
2
• Short circuit N and L2 in the three-phase three-line system. Set the smarte meter to
Three Phase Three Line mode via Solar Go app. Scan the QR code below to get more
information.
Grid-Tied
PV Inverter
Loads
PV
Circuit Breaker
(Optional)
(15AWG).The recommended CT: nA/5A for external CT(200≤n≤5000).
SolarGo App
User Manual
Fuse 0.5A
NOTE
103
Utility Grid
Meter

Publicidad

loading

Este manual también es adecuado para:

Gmk330Gmk360Gm330