INSTALLATION
The main part of the unit is kept folded before opening. Slightly open it to the
1.
position with angle of 30° as below:
Swing the heating rack to the horizontal position and fix it by pressing the con-
2.
nector outwards.
Operate other heating racks with the same above procedure.
3.
Turn on the switch; the unit starts to work with red light on. It may take 5-10 min-
4.
utes to reach a stable temperature at 50-55 °C.
30°