EN
20
INSTALLATION
This machine shall be installed by authorised and skilled personnel only.
Please check all accessories before installation.
Requirements of installation conditions
1.
The machine is equipped with a booster pump and shall be used with tap
water only.
2.
Please use the right adapterfor voltage 100 V-240 V.
3.
Make sure the installation place is clean and not in the proximity of direct
sunlight, high humidity, flammables, explosives or unsafe electrical
equipment.
Attention: Please pay attention to the safety when drilling and make sure there
is no hidden water pipe,electric wire and gas tube.
Installation of the Quick Connector
Quick connector ports are adopted on the inlet and outlet of the machine. A quick
connector is a port which can connect quickly and firmly without any tools.
1.
Firstly, pull out the Ω -type clip on the port, push the movable plastic ring to
the port, make it attaching to the port to move the plastic plunge or PE pipe.
2.
Insert the PE pipe to the end of the port, then pull slightly to make a gap
between the movable plastic ring and the port. Finally insert the Ω -type clip
in the gap.
3.
When taking the PE pipe from quick connector, first pull out the Ω -type clip.
Push the movable plastic ring to the port to make it attaching the port. Then
you can pull out the PE pipe.
Disconnect and Connect of PE pipe and quick connector
Detach the Ω -type clip, trim the PE pipe to achieve a smooth end, and insert it
into the quick connector. Next, give it a slight tug to verify that the PE pipe has
been securely sealed by the O-ring within the quick connector. Lastly, insert the
clip to hold the pipe in position.