Descargar Imprimir esta página

Delta 5CN-550L Instrucciones página 3

Interfaz digital del bano turco

Publicidad

Idiomas disponibles

Idiomas disponibles

Cleaning and Care
Interface MUST be installed inside the steam room for proper operation of the system. Use a damp cloth and mild
soap. Do NOT use abrasive cleaners which might scratch the surface or the base of the interface.
The 5CN-550L, 5CH-550L & 5CB-550L digital interfaces will only function with 5GE SteamScape series generators.
1
Pre-Installation - Interface Location
The 5CN-550L, 5CH-550L & 5CB-550L digital interfaces must be installed inside the steam room and away from
the steam head (opposite wall preferred). For convenience the recommended height from the floor is four feet.
Provide a 2 3/4" hole in the wall at this location (see Figure 1).
Figure 1
IMPORTANT: Run the
interface cable through
a ¾" conduit.
Required inside
Required Inside
installation. Locate
Installation. Locate
away from the
away from the
direct line of shower
direct line of steam
spray and do NOT
spray and do NOT
locate above steam
locate above steam
head.
head.
located four feet
2 3/4" Hole
from the floor
Double-Sided
Adhesive Pad
To Steam Generator
Coupler
3
114570 Rev. A

Publicidad

loading

Este manual también es adecuado para:

5ch-550l5cb-550l5cn-550l-pr