Installation (continued)
4
Installing the faucet assembly
NOTE: Silicone sealant is required under the gasket (B).
□
Place the faucet (A) through the mounting holes
in the sink.
□
Secure the faucet (A) to the sink using the
mounting nuts (C) provided. Hand tighten only.
C
Operation
1
Flushing and checking for leaks
IMPORTANT: After installation is complete, remove the
aerator from the faucet (A) to ush the water lines. Do not
lose the gasket (1) in the aerator.
□
Ensure the faucet (A) handle is in the off
position and turn on the water supply to check
for leaks. If you discover any leaks, check your
connections to ensure they are installed properly.
□
Remove the aerator and housing (if applicable).
Turn on the hot and cold handles to allow the
water to run for at least one minute. This
ushes away any debris that could cause
damage to internal parts.
□
Turn off the water and reinstall the aerator and
housing (if applicable).
A
5
5
Making the water supply
connections
NOTE: The hot side inlet tube is indicated by a label.
If the label is not present, the hot supply tube is the longer
of the two inlet tubes.
□
Remove the sleeve from the inlet tube.
□
Use 1/2 in. I.P.S. faucet connections (2), or use
supply line coupling nuts (3) (not included) with
a 3/8 in. O.D. ball-nose riser (1).
□
If it is necessary to plug up one of the inlet tubes,
use a plug (not included) with a washer.
IMPORTANT: WHEN PRE-TIGHTENING THE WATER
SUPPLY LINE TO THE FAUCET CONNECTOR, A SECOND
WRENCH MUST BE APPLIED TO THE INLET SUPPLY TUBE
FITTING TO PREVENT IT FROM MOVING OR TWISTING
WHEN TIGHTENING THE WATER SUPPLY LINE.DO NOT
OVERTIGHTEN.
1
1
3
1
Please contact 1-855-HD-GLACIER for further assistance.
2
2
2
A
HOMEDEPOT.COM/GLACIERBAY