Descargar Imprimir esta página

SGL BU10 Manual Del Usuario página 12

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

5 Operation
NOTICE
CAUTION
6
WARNING
6
DANGER
6
5.1
Switch the power on
Connect the power plug to the mains alongside the pitch.
5.2
Switch the power off
1. Turn the main switch to the "OFF" position to turn off the lights.
2. Wait a minimum of 30 minutes to allow the lights to cool down.
3. Unplug the power plug from the mains.
5.3
Switch on the lights
1. Press the switch to the "ON" position to turn on the lights.
Note: For troubleshooting when the lights do not switch on, see chapter 7 "Troubleshooting".
12
Leave the lights switched off for at least 30 minutes before you switch them back
on.
Only disconnect the unit from the mains when the lights are off.
Switch off the unit and disconnect all cables before moving the unit.
Make sure that the legs are positioned correctly and stable.
Make sure that the locking pins and height adjustment pins are placed correctly.
Do not place any cables directly below the lights. The heat of the lights could cause
the cables to melt.
Do not touch the light bulbs during and shortly after operation. The light bulbs are
hot and will cause burns when touched.
Make sure that the surface beneath an operational unit is clear from objects that
will be damaged (e.g. cables that will melt) by the heat of the lights.
When watering the pitch, prevent the light bulbs from getting in contact with the
water. Water could damage the heated light bulbs.
The unit must be used with an outdoor rated extension lead socket box and cable.
SGL for the love of grass

Publicidad

loading

Productos relacionados para SGL BU10