Installation should be in accordance with local plumbing and electrical codes.
FLUSH ALL PIPES THOROUGHLY BEFORE INSTALLATION.
STEP 1. FAUCET INSTALLATION
Shut off inlet water supplies. On 8" centre faucet, inlet supply lines should be secured to support the faucet. Inlet supply shanks
should be positioned horizontally to line up with the 8" faucet inlets. Place rubber washers inside the body union nuts and tighten
nuts securely.
STEP 2. SPOUT INSTALLATION
Install the spout assembly to the faucet body, tightening spout nut securely.
STEP 3. TEST FOR LEAKS
Turn on water supplies and test for leaks at the faucet supply inlets and faucet connections.
STEP 4. SPOUT OUTLET INSTALLATION
Before installing the spout outlet, turn hot and cold water faucet handles to the full open position. Flush out the lines for at least
one minute to clean out any construction debris (particles of solder, copper chips, pipe dope, plumber tape, etc.). After flushing,
shut off water at faucet handles and assemble spout outlet to the faucet spout.
203 ± 6mm
(8.0" ± 0.25)
140 – 267mm
(5.5" – 10.5")
-AC OPTIONAL ADJUSTABLE CENTRES
-CENTRES CA AJUSTABLES OPTIONNELS
-CENTROS AC AJUSTABLES OPCIONALES
INSTALLATION INSTRUCTIONS
1/2 – 14 NPT
FEMALE
FEMELLE
HEMBRA
1/2 – 14 NPT
MALE / MÂLE /
VARÓN
1/2 – 14 NPT
FEMALE
FEMELLE
HEMBRA
1/2 – 14 NPT
MALE / MÂLE /
VARÓN
w w w . s p e c s e l e c t . c o m
A
64mm
(2.5")
8" Centres
8 po Centres
8" Centros
81mm
(3.2")
Page 2
Fig. 1
Fig. 2
210206 Rev. B