rigging and installation
EVO20-M Line-Array elements feature an integrated steel rigging
hardware especially designed for ease of set-up and use. Up
to 10 internal angulation options in 1° steps are available and
dedicated stow positions for a precise and quick deployment of
the array.
The following are the basics for array element linking.
BASIC GUIDELINES
1
To proceed setting-up the array, release and unlock the front
and back links of the lowest element in the system.
2
Position and lock the front and back links of the following
element in the array using the spare pins stored in the dedicated
hole labelled as Stow.
3
Finally lock the desired position with the dedicated pin stored
in the Groundstack/Stow hole. Repeat the operation for the any
other EVO20-M element in the system.
- 9 -
User Manual