Descargar Imprimir esta página

Allen + Roth TPGAZ24109B Manual Del Usuario página 22

Solárium

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY INSTRUCTIONS
22.1 Attach the ends of the Upper
reinforcement strip (Q1/Q2/Q3) to the Long
support bar (M) and Short support bar (L) by
fixing them to the Bolts (JJ) shown in steps
13 and 14.
22.2 Attach the ends of the Bottom
reinforcement strip (R1/R2/R3) to the Long
support bar (M) and Short support bar (L),
by fixing them to the Bolts (JJ) shown in steps
13 and 14.
22.3 Fasten the bolt under the long/short
support bar to the Bolt cover (II) .
Hardware Used
Bolt Cover
II
22
L
JJ
Q3
KK
LL
II
X 20
R1
M
JJ
R1
KK
LL
II
22
JJ
Q1
LL
Q1
KK
II
R1
Q1
Q2
Q3
Q2
R2
Q1
Q3
Q2
Q1
R3
R2
R1
JJ
R3
R2
KK
II
M
Q2
R2
Q1
R1
Q2
R2
L
R1
LL

Publicidad

loading

Este manual también es adecuado para:

5276103