Descargar Imprimir esta página

eibe 566358 Instrucciones De Montaje página 4

Publicidad

Attention:
Please keep these documents!
Please indicate the RM-code on all inquiries and complaints.
Installation notes:
Knock round-head screws only with a rubber hammer to avoid damaging the anticorrosive coating. Use washers
underneath all nuts and tighten them carefully. If overtightened , an unnecessary number of wood fibres under the screw
head will tear. Counterbores are provided for countersinking the screw nuts. For easier positioning in the counterbores,
insert one or two screw nuts into the nut and place on the screw. Use a high-performance two-speed power drill for the
assembly of the play equipment.
Site requirements:
Please refer to the information in our tender documents and in the foundation plan. Before putting the equipment into
service, ensure that all assembly tools have been removed. Unusual site conditions such as peat soil or frozen
underground must be taken into account for the dimensioning of the foundation.
Maintenance & Inspections:
Please find various information in the enclosed Maintenance & Inspections document.
Further particular information and installation details, which are eventually to be considered for the yearly inspection, are
specified in this documentation.
Fußnoten:
Impact surface in accordance with EN1176
a) Yellow (inner) area shows the impact surface with shock absorption requirements.
Surfacing inside the impact area (DE/AT/NL):
Sand
Surfacing inside the impact area (other countries):
Sand
b) The outer line encloses the entire impact surface.
All areas must be free of hard, sharp-edged and protruding parts.
Key foundation list
ID
Type
X-Pos. = horizontal measure to 0-point
Y-Pos. = vertical measure to 0-point
z-Pos.
Z-Rot.
Größe
Slides are not included.
Safe use of the equipment only with original eibe slide or by closing the slide opening in accordance with DIN EN
1176.
eibe Produktion + Vertrieb GmbH & Co. KG | Industriestraße 1 | 97285 Röttingen | www.eibe.de
Gravel
Bark mulch
Wood chips
Gravel
Bark mulch
Wood chips
= foundation number
=
OF=concrete
foundation,
=
FFk=eibe-prefab foundation
=
FFr=eibe-prefab foundation
=
FFg=eibe-prefab foundation
=
FL3=Prepare AFTER the installation!
= op edge of foundation to surface soil
= orientation of foundation
= length x width x depth
Impact-
attenuating
turf
tiles
Impact-
attenuating
turf
tiles
small,
round,
large,
Top soil
concrete
stone
Top soil
concrete
stone
4/32

Publicidad

loading