7- RE-ASSEMBLY PROCEDURES
1
2
Place the processing components back inside
vessel "1",paying special attention to follow this
sequence: starting with "2", "3", "4", "5", as shown in
3
5
the corresponding images above.
Please ensure that the writing on the
rubber rings in kit "4" is visible from
the top of the squeezing unit "Q".
Place spout "R" back inside
the machine, and then
place the entire squeezing
unit "Q" on its base.
Q
Please carefully observe the
assembling sequence of
components "R" and "Q".
R
4
Warning!
ENG
13