Descargar Imprimir esta página

CRAFT+MAIN JETCOAT GFS603678-CO Manual Del Usuario página 13

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION PROCEDURE / FINISHING
9
CAULK CORNERS AND EDGES
Properly caulk around the Jetcoat® Shower Wall System to insure a secure fit and finish.
This includes but is not limited to:
• Interior corners where shower walls meet
• Corners where the walls meet the base.
• Outer edge of Side Wall Panels
• (Optional) Caulking along the top edge of the entire enclosure is not required but may help
contribute to a finished look.
Important Note: Please keep the entire area dry for a minimum of 24 hours to allow the caulk
and construction adhesive to properly cure.
1
4
- 12 -
3
5

Publicidad

loading

Este manual también es adecuado para:

Jetcoat gfs603678-tu