2
Installing the S1 Weigh System
Before you start:
Fully charge the indicator overnight.
Step 2:
Use the supplied bolts to bolt the weigh platform onto
the load bars.
2
Step 1:
Place the load bars on a flat surface up to 8' (2.5 m) apart.
Step 3:
Tuck the load bar cables under the weigh platform.