Descargar Imprimir esta página

EMKE F13SSC00BL Instrucciones De Instalación página 5

Sistema de ducha

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

SHOWER SYSTEM
d) Install the raiser rail to the thermostatic panel and screw it in the wall(Figure 1).
e) Install the arm pipe and secure it by Allen key (Figure 2).
Step 4: Assemble the shower head (Make sure there is a washer inside of
the shower head)
a) Connect the overhead shower to the arm pipe (Figure 3).
b) Find a suitable position for the hand shower head. Use the glue to secure. Leave 24 hours till it's completely dry
before use (Figure 4).
c) Connect the hose to the thermostatic shower bar and connect the shower head on the other end (Figure 5).
Function Guide:
A. Adjust the water temperature:
Press the button and turn the temperature knob left and right to
increase and decrease the temperature.
B. Switch between the hand shower and overhead shower:
press the hand shower and overhead shower.
Figure 1
Figure 4
Figure 3
Figure 2
Figure 5
5
EN
A
B

Publicidad

loading