Descargar Imprimir esta página

GUTMANN TYP 2800 ML 830 Instrucciones De Montaje página 50

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 104
EN
6. ASSEMBLY PREPARATION
Transport, unpacking, setting up
If the device is brought from a cold environment into the operating room, condensati-
on may occur. Please wait until the device has reached the correct temperature and is
absolutely dry before putting it into operation. The acclimatization time depends on
the temperature difference and the device as well as its construction. However, it
should be at least 12 hours.
Please wear protective gloves during installation to avoid the risk of injury. Before
mounting the hood, prepare the necessary tools.
For the installation of the hood, the customer must provide the prerequisites for a
smooth installation of the hood and cover kitchen appliances.
Prepare a suitable exhaust air duct, if necessary open false ceiling, partition walls,
kitchen block, create openings etc...
50

Publicidad

loading