INSTRUCTIONS MANUAL
PRELIMINARY OPERATIONS
- Check that the main switch (ref.1, Fig.13) is positioned on O. Connect the machine to the
mains and switch it on.
1
FIG.13
- The operator can check all machine data:
o Check that the OIL container is empty, if necessary replace it as described in the
MAINTENANCE.
o Check that the level in the used oil container is less than 200 cc, if necessary empty it as
described in the MAINTENANCE chapter.
o Check that at least 2 kg of refrigerant are available in the cylinder, if necessary fill the
inner cylinder using an appropriate external refrigerant bottle and following the instructions
in the inside of the TANK FILLING inside of the MAINTENANCE menu
-29-