Descargar Imprimir esta página

CRISTINA TILDE CRITI256 Instrucciones De Montaje

Publicidad

Enlaces rápidos

MANUTENZIONE E PULIZIA - MAINTENANCE AND CLEANING - MAINTENANCE ET NETTOYAGE - PFLEGE UND REINIGUNG - MANTENIMIENTO Y LIMPIEZA -
UDR BA A IŠT NI - UDR BA A ISTENIE
sempre
substances or their derivatives, such as hydrochloric acid, muriatic acid, sulphuric acid, caustic soda, etc., and in any case do not use abrasive supports (e.g. metal or non-
Always make sure to rinse thoroughly in order to avoid the deposit of any residual cleaning product.
Toujours
siempre
GARANZIA - GUARANTEE - GARANTIE - GARANTIE - GARANTÍA - ZÁRUKA - ZÁRUKA
Tutti i prodotti
All
Tous les produits
Alle
DATI TECNICI - STANDARD SPECIFICATIONS - DONNEE TECHNIQUES - TECNISCHE STANDDARDDATEN - DATOS TÉCNICOS - TECHNICKÉ UDAJE - TECHNICKE UDAJE
1.
2.
Maximální pracovní tlak
3.
4.
For thermostats:
Für Thermostat:
5.
Für Thermostat:
6.
7.
8.
immer, dass Sie sorgfältig nachspülen, um Ablagerungen von
Presión max. de ejercicio
For thermostats: Pressure difference between hot and cold water
TILDE
CRITI256 | CRITI257 | CRITI258 | CRITI259
+ CRICS200 | CRICS201 (non incluso/not included)
ISTRUZIONI DI MONTAGGIO
INSTALLATION INSTRUCTIONS
NOTICE DE MONTAGE
MONTAGEANLEITUNG
INSTRUCCIONES DE MONTAJE
Le test d'installation en
CRISTINA S.r.l. a socio unico
CRITI257
100
ø
80
185
ø64
5-55
ø41
ø50
G1"1/4
CRITI256
227
80
185
ø64
5-55
ø41
ø50
100
G1"1/4
CRITI258
227
80
225
ø64
5-55
ø41
ø50
G1"1/4
100
CRITI259
100
ø
80
226
ø64
5-55
ø41
ø50
G1"1/4

Publicidad

loading

Resumen de contenidos para CRISTINA TILDE CRITI256

  • Página 1 ø50 G1"1/4 For thermostats: Für Thermostat: CRITI257 CRITI259 For thermostats: Pressure difference between hot and cold water Für Thermostat: ø ø Le test d’installation en ø64 ø64 5-55 ø41 5-55 ø41 ø50 ø50 G1"1/4 G1"1/4 CRISTINA S.r.l. a socio unico...
  • Página 2 MONTAGGIO E PEZZI IDENTIFICATIVI DI RICAMBIO - INSTALLATION AND SPARE PARTS - MONTAGE ET PIECES INDENTIFICATION L’INSTALLAZIONE DEVE ESSERE ESEGUITA DA PERSONALE QUALIFICATO! DE RECHANGE - MONTAGE UND ERSATZTEILE - MONTAJE E IDENTIFICACIÓN DE LAS PIEZAS DE RECAMBIO SPURGARE LE TUBAZIONI PRIMA DI COLLEGARE IL RUBINETTO ALL’IMPIANTO. INSTALLATION PERFORMED BY QUALIFIED PERSONNEL! BEFORE CONNECTING TO MAINS, BLEED THE PIPES TO AVOID DAMAGE.

Este manual también es adecuado para:

Tilde criti257Tilde criti258Tilde criti259Tilde crics200Tilde crics201