11. Fit 2" nipple and ball valve. (not supplied)
12. Fit any pipework required in addition to the kit supplied.
13. Fill with water
(1) Regularly check ground for subsidence, vegetation growth, etc.
(2) Inspect the tank and all parts for mechanical damage at least every six months (see instruc-
tions for tank damage repair).
(3) Periodically check tightness of all fittings.
(4) After dismantling the tank ensure that it is clean and dry before re-packing and storage.
Replace any damaged parts with new from supplier.
Maintenance Procedures
Page 7