Step 4 - Wall Cutting; Step 5 - Liner Installation - Trigano PISCINES ABAK OSMOSE Serie Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 72
Place the upper connecting plates (820 121) on the wall
facing the posts (BB).
On the lower portion, attach the posts (BB) on their
connecting plate (820 121) using 3 screws. On the upper
portion, attach the posts (BB) to their connecting plate
(820 121) using 1 screw, not tightened.
Step 3 : place the ground mat
(please note some kits are not supplied with a mat)
PLEASE NOTE
It is important to make an ogee from 8 to 10 cm out of ne sand
around the pool's inner periphery, particularly along the pool
sides, and cover the bottom of the pool with a 2 cm sand layer.
The sand prevents the liner from sliding under the wall and
protects it from the protruding parts of the pool's structure that
could puncture it.
Cover the prepared ground with a ground mat going up the wall
a few cm. A x the ground mat in places on the wall using
double-sided tape.
The ground mat prevents mushrooms and grass from growing.
Step 4 : Cutting the Wall
We suggest you use gloves for this operation. After assembling the wall (JJ), make the cuts for the skimmer and discharge nozzle using
metal shears (not supplied) or another cutting tool. File and coat the edges with a rust-inhibiting agent and cover them with adhesive tape
(not supplied).
Step 5 : Liner Installation
WARNING
Unfold the liner from the centre of the pool towards the exterior. Spread it out so as to cover the bottom of the pool.
Starting with the wall liner seam, hang the liner on the wall (JJ) making sure that the seam is straight and vertical.
As you pass the liner over the wall (JJ), you may attach it temporarily using clothespins.
The overhang must be regular. If you have a liner with a pattern on the edge, simply select a mark and keep it all the way around the pool.
820 121
BB
THIS STEP IS NOT OPTIONAL; IT MUST BE PERFORMED!
(perform with bare feet)
This operation is delicate and must be performed with great care.
We recommend you install the liner when the outside temperature is between 18°C and 25°C.
You must expose it outside for at least 2 hours so it recovers its exibility.
The side where the seams are smooth is the inside of the liner.
In order to enter or exit the pool during installation, please use the pool ladder.
65 Notice N°880101 Rev B
121 305
JJ
9

Publicidad

Tabla de contenido
loading

Tabla de contenido