Installation Instructions; Required Tools - Danby Parcel Guard DPG37UN Manual Del Propietário

Ocultar thumbs Ver también para Parcel Guard DPG37UN:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION INSTRUCTIONS

FEATURES
1
1. Signal fl ag
2. Upper door handle
3. Upper door
2
4. Lower door
5. Door lock
3
ACCESSORIES
A. Concrete bolts with expanding sleeves (x2)
B. Wood screws (x2)
C. Washers (x2)

REQUIRED TOOLS

4
The following tools are required to complete the
installation:
• Safety goggles
5
• Pencil or pen
• Wrench
• Power drill with 1/4" concrete bit
LOCATION
The installation location should include a level
location that is strong enough to support the Parcel
Guard when it includes ballast and packages.
3

Publicidad

Tabla de contenido
loading

Tabla de contenido