Boiler Cleaning - IPC SG-48 S8010 M Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

TANK-SUCTION ACCESSORY
BRUSHES
These
connected
LANCE.
remove resistant dirt and for
deep
corners or small spaces. Choose
the nylon or brass type according
to the surface to be treated.
MICROFIBER CLOTH
Cloth to be used hooked with the
multi-purpose brush to clean
delicate surfaces, such as
wooden floors, furniture, etc. It
offers a great absorption power,
reduces the power of the steam
dispensed and reduces the
friction of the brush during the
treatment.
MANTAINANCE
* Always remove the plug before
cleaning or carrying out operations
on the machine. * End user must
not
open
machine.
For the safety of the operator and to always ensure a
perfect performance, we recommend the following
checks and maintenance:
AFTER EVERY USE:
For a correct cleaning, it is advice to clean the machine
and its accessories with a clean cloth moistened only
with a few drops of water. Do not use alcohol or other
solvents,
they
may
components.
To
maintain
efficient
accessories, check the o-ring seal (steam sealing
gaskets) and possibly wet them with a little silicone
grease.
VACUUM FUNCTION: when you finish to vacuum, it is
advisable to vacuum some water to clean the conducts
and the filter. Afterwards, dry the bucket or do not totally
close it so that it will dry itself.
PERIODICALLY:
Periodically check that the power cord does not show
signs of wear or aging. If it is damaged, it is absolutely
necessary to get it replaced by specialized personnel
before being able to re-use the appliance again.
Accessory to be connected
to the flexible hose to
vacuum
and
clean
tanks.
brushes
must
to
the
STEAM
They are used to
cleaning,
even
in
(End user)
or
dismantle
damage
the
plastics
and
easy
to
couple
Once a year a check and boiler cleaning must be
carried out in our authorized centers.
the
RINSE: It's recommended at least every 50 hours of
operation or 2 months.
a) DISCHARGE: The machine must be cold or
definitely discharged from the steam pressure and the
plug disconnected. With the help of a wrench CH 21
be
unscrew the cap (15) placed under the machine in
correspondence of the boiler (see image). After having
taken off the cap, shake slightly the machine to let the
the
water and the dissolved limestone out.
When the boiler is empty, clean and close carefully the
cap tightening it with the wrench.
b) FILLING: Fill the water tank (7), turn the machine on
and make it start again, waiting for the boiler to be re-
charged again.
(att: it may be that during the first charge cycle, the
"end of water" light turns on and you need to shut
down/restart the machine to complete the load)
BOILER AND TANK CLEANING:
The boiler cleaning is recommended at least every
200 hours of operation or 6 months.
the
1- Cleaning with suction of the plastic tank (7): Check
that the water level in the plastic water tank (7) is at
least halfway up, shake/move the machine to shake
the water and any possible deposit.
Connect the flexible hose to the connector block (5) of
the machine, and hook the "TANK SUCTION"
accessory into the handle, insert the accessory tube
into the tank (7) and completely suck the water in it.
(Operation also possible in the tank (8))
2- The machine must be cold or definitely discharged
from the steam pressure and the plug disconnected.
Exhaust the contents of the boiler, carefully following
and
what described in the previous point "BOILER
DISCHARGE".
the
Prepare 2 liters of water and vinegar, in proportions
of about 60% vinegar 40% water.
Insert the prepared liquid in the refill tank of the
machine (7).
3- Turn on the machine and wait for the pump to finish
filling the boiler. (Att: it may be that during the first
charge cycle, the "end of water" light turns on and you
need to shut down/restart the machine to complete
the load). When fully charged, the machine will start
the heating cycle (Heat): do not wait for the heating
but immediately turn off the main switch turn off the
main switch, unplug the power plug and let the
machine to rest for 6-7 hours.
(Att: do not let inside the solution over the indicated
time period).
4- With the machine cold and the plug disconnected,
shake it well and then open the cap under the boiler
15

BOILER CLEANING

(End user)
15

Publicidad

Tabla de contenido
loading

Tabla de contenido