Descargar Imprimir esta página

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 10
- GB -
Dear customer
Read these instructions through completely before assembling your product in order to avoid errors
in assembly or damage.

IMPORTANT

Please use the enclosed packing list to check immediately that your Engine house
has been delivered complete and intact.
Please do not dispose of the packing list before the guarantee period has expired. This list enables
you to check that all the individual parts are present. It should be retained along with the proof of
purchase. Any complaints which may arise can probably be easily rectified with this list. The item
numbers on the packing list do not correspond to the item numbers in the following assembly
instructions.
We recommend that 2 people carry out the assembly.
In order to prevent accidents, we recommend that children are kept out of the direct vicinity during
assembly.
We reserve the right to make further technological developments. This means that there many be
minor deviations in the illustrations.
The pallet on which the structure is transported comprises 2 floor beams which are required for the
assembly of the structure and 2 distance timbers which are only packaging material and can be
disposed of.
Please do not simply throw away the packaging material. Paper, card and corrugated board as well
as plastic packaging materials should be placed in the correct collection containers.
Recommendations
A prerequisite for successful assembly is an absolutely level and square foundation. We
recommend a continuous foundation.
A foundation plan can be obtained from your specialist dealer.
A raft foundation is also possible.
In order to avoid rising damp, we recommend that a barrier layer using the packaging film, roofing
paper or similar be laid between the foundation and the floor beams.
Roofing paper for a barrier layer is not included in the scope of this delivery.
Fit the wall boards together, with the tongue pointing upwards. If necessary, use a rubber mallet,
where the assembly timber will prevent any damage to the tongue. The assembly timber can be
found in the front wall package.
The structure should be anchored to the foundation to protect against wind damage. Concrete
anchors or steel angles obtainable from specialist suppliers are suitable for anchoring the floor
beams to the foundation. The anchors are not included in the scope of this delivery.
Please drill pilot holes for all screw connections to avoid damaging the wood. The following symbol
in the instructions will indicate when this is necessary:
Wood protection
Before and during assembly, protect untreated wood from direct sunlight or moisture.
We recommend that you consult an expert in wood treatment agents.
We advise you to treat all wood components with blue stain prior to assembly.
Once the structure has been assembled, give the exterior of the entire construction at least
two coats of an open-pore wood protection agent.
Doors and windows are to be treated both inside and outside with the wood protection agent.
The floor beams have already been adequately treated by us (boiler pressure impregnated).
A regular coating in accordance with the manufacturer's instructions of the wood protection agent
is necessary to protect the wood.
Techn. Änderungen vorbehalten!
Alle Maßangaben sind ca. Maße
 Copyright HRB 3662
3

Publicidad

loading

Este manual también es adecuado para:

357.2424.20102357.2432.20100