Twin-Star International 23MM0925 Manual De Instrucciones página 4

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4. Locate Hearth/Base (A) and set out
finished side up on the floor.
5. Insert one Wood Dowel (N) into each of
the pre-drilled holes.
6. Attach the Completed assembly from step
3 to the Hearth/Base (A). Make sure the
dowels are seated into the pre-drilled holes
in the Hearth/Base. Using Bolts (L) and
Washers (M) attach panels through the
pre-drilled holes in the mounting blocks.
HAND TIGHTEN ONLY.
7. Insert one Wood Dowel (N) into each of
the pre-drilled holes.
8. Then locate Center Shelf (H) and lay
finished side up on top of completed
assembly from step 6. From the inside,
attach the Center Shelf using Bolts (L)
and Washers (M) through the pre-drilled
holes in the mounting blocks.
HAND TIGHTEN ONLY.
L
M
A
N
Hearth/Base
N
C
M
L
Completed Assembly
N
N
H
N
B

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido