3. Proper use

The swing arm is designed to be attached to
a cable winch. For this, the swing arm must be
mounted to a well fastened steel bar with a dia-
meter of 48 mm.
The equipment is to be used only for its prescri-
bed purpose. Any other use is deemed to be a
case of misuse. The user / operator and not the
manufacturer will be liable for any damage or inju-
ries of any kind caused as a result of this.
Please note that our equipment has not been de-
signed for use in commercial, trade or industrial
applications. Our warranty will be voided if the
machine is used in commercial, trade or industrial
businesses or for equivalent purposes.

4. Technical data

(Fig. 20)
Reach l: ................................................ Max. load:
l1 = 750 mm .................................... m1 = 600 kg
l2 = 1100 mm .................................. m2 = 300 kg
Swing range: max. 180°
5. Before putting the machine into
operation
The swing arm is designed to take a cable
winch.
To mount the swing arm, you need a round
steel bar with a diameter of Ø 48 mm; its wall
must be a minimum of 3 mm thick. Ensure
that the anchor points of the steel bar are
able to adequately support the forces that will
be applied to it. Consult an authorized pro-
fessional to ensure that this is properly done.
This steel bar is not included in the scope of
delivery.
Anl_H-SA_1100_SPK7.indb 11
Anl_H-SA_1100_SPK7.indb 11
GB
6. Mounting and assembly
Attach the pipe collar (1) (with the large hinge
pin (A)) to a steel bar using the holding bar
for the pipe collar (2), washers (20), spring
washers (19) and two hexagon nuts (18).
Before you tighten the bolts, push the pipe
collars (1) to the desired working height of the
swing arm (Figure 3-5).
Apply lubricating grease to the hinge pin (A).
Place the square-edged boom (5) in the pipe
collar (1) and push in the hinge pin (A) until
it is correctly positioned. Then secure it by
screwing the hex screw (7) into the pipe collar
(1).
Now attach the pipe collar (3) (with the small
hinge pin (B)) to the steel bar above the
square-edged boom in the same way as you
did with pipe collar (1). Adjust the height of
the upper pipe collar (3) so that the distance
H between the two pipe collars (1/3) measu-
res approx. 450 mm.
Now tighten the bolts of the pipe collars. Use
a torque of 45 Nm to tighten the nuts (18).
Push the extension pipe (6) by its end with
no bore hole into the square-edged boom (5)
(Figure 10). Make sure that the bore hole (C)
is aligned vertically as shown in Fig. 12.
Connect the support arm (4) to the square-
edged boom (5) and the extension pipe (6)
by inserting the hexagon bolt (8) through the
coinciding bore holes, placing a washer (11)
and a spring washer (10) over the bolt (8),
and securing the connection with a hexagon
nut (9) (Figure 11-13).
A bolt (16) is inserted at the end of the ex-
tension pipe to prevent the cable winch from
sliding off (Figure 14-16).
When the cable winch is pushed out to 750
mm, it is not allowed to lift more than 600 kg
(Figure 17).
When the cable winch is pushed out to 1100
mm, it is not allowed to lift more than 300 kg
(Figure 19).
When mounting the cable winch on the exten-
sion pipe (6), the pads (12) must be pushed
in under the clamping brackets in order to en-
sure that the cable winch is held securely in
place (Figure 18). When the assembly work is
finished, an up and down test and a 180° left
and right swing test must each be performed
twice with no load. Then the cable winch must
be loaded with increasingly heavier loads
up to the maximum permissible load weight.
- 11 -
27.08.2019 15:12:51
27.08.2019 15:12:51

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

22.554.01

Tabla de contenido