Installation - Lovato DMG800 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

18
INST LL TION
– DMG800 is designed for flush-mount installation according to IEC 61554.
– Insert the device into the panel hole, making sure that the gasket is properly positioned between the panel and the device front frame.
– From inside the panel, for each four of the fixing clips, position the clip in one of the two sliding guide, then press on the clip corner until the second guide
snaps in.
– Push the clip forward pressing on its side and making it slide on the guides until it presses completely on the internal surface of the panel.
– Repeat the same operation for the four clips.
– In case it is necessary to dismount the multimeter, lift the central lever of the clip in order to release it, then pull backward on the guides until it slips off.
– For the electrical connection see the wiring diagrams in the dedicated chapter and the requirements reported in the technical characteristics table.
– Once the wiring is completed, it is possible to mount the terminal covers supplied with the instrument. These terminal covers are sealable, making impossible
the tampering of the instrument and/or the access to the screw terminals.
– To install the terminal covers insert the side hooks into their housing and apply a light pressure until they snaps in. Be aware of the match between the
terminal block and the proper terminal cover.
– The locking of the terminal covers must be done inserting the proper wire in the side loops and applying the seal.
TAC
G
B

Hide quick links:

Publicidad

Tabla de contenido
loading

Productos relacionados para Lovato DMG800

Tabla de contenido