BA_REFUsol 008K-023K_V04.0_WW
UDC
Activating
This process can take up to one hour while the device is commissioned; during normal
operation, it takes up to 3 minutes.
Feed mode:
The "ON" status LED emits steady light; the "READY" status LED turns dark.
Display
PAC
UAC
UDC
E Tag
Operation
4.4 Navigation on the Control Panel
Figure 6
F1:
Display the menu
F2:
Select input of System size to standardized yield data
▲▼:
Select the menu level (level up, level down)
◄►:
Function in the menu: navigation through the menu level (previous menu, next menu)
Function while parameters are edited: digit to the left, digit to the right (decade jump)
ESC:
Acknowledge failures and exit from menu-lvel, exit from input level without acknowledge
:
Confirm the selected menu and entered data
34
Solar cell voltage in volts (V)
Feed power in watts (W)
Line voltage in volts (V)
Solar cell voltage in volts (V)
Yield of the day in kWh
Display Navigation
Status-LED
Copyright REFUsol GmbH