Versatis_Conference_uk.qxd
28
2. INSTALLATION
Base
Place the base and Pod units on a flat, stable surface.
l
2.1
INSTALLING THE BASE
2.1.1
Connecting the base
Plug the base power supply cable into the
l
Connect the mains adapter to a 230 V / 50 Hz electrical socket.
l
The red power indicator on the base should light up.
"
Plug one end of the phone cable into the
l
2.1.2
Wall mounting (optional)
To wall-mount the base, follow this procedure:
Make sure that the base unit is not too far from a power socket and that you do not drill through any electrical wiring concealed in
l
the wall.
Drill three holes using the template provided on page 143 of this guide.
l
Insert three screws (not supplied) into the holes. Leave the screw heads approximately 3 mm proud of the wall.
l
Slide the base unit down over the screw heads.
l
31/03/2005
16:03
Page 28
socket at the back of the base.
socket at the back of the base, and the other into the phone line socket.
Pod