GB
Operation
1
Putting the kettle into operation
Prior to first use, you must unwind the power cord completely and guide it through the opening
on the base.
2
Filling the water
To fill with water, lift the water container from the base using the handle and press the button to
open the lid. There is a measuring scale for cups and litres on the inside. After filling, close the lid
in such a way that it audibly clicks into place.
Observe the MAX marking for
the maximum water volume.
Do not overfill.
www.zwilling.com
1.
1.
Operation
2.
2.
19