Construction and Function
Transport/transporting
EN
Fig. 4: Detailed view of plate broom
Item no.
Component
14
Connection
15
Toothed sleeve
16
Helical gear toothing
60
5. Transport/transporting
5.1 Delivery
NOTE
Visible damage on the outer packing must be
14
immediately confirmed on delivery by the par-
cel service driver. If transport damage is only
15
noticed during unpacking, the parcel service
must be notified in writing within 24 hours after
delivery so that it can be liable for the damage.
5.2 Scope of supply
• Device
16
• Sliding bracket
• 2 telescopic pipes
• Operating instructions
5.3 Handling Packaging Materials
• Always dispose of packing in an
environmentally responsible manner.
• Observe the local and regional legal provisions
in force.
5.4 Storage
NOTE
Improper storage can result in damage to the
sweeping machine.
• Store the sweeping machine only in cleaned
condition and with an emptied sweeping
container.
»
Information on emptying the sweeping
container can be found in Section and on
cleaning in Section of this operating manual.
SWP 355