PREPARATION FOR INSTALLATION
SAFETY / INSTRUCTIONS
Beware of hazard in case of wrong installation!
The bathtub may be installed by specialised personnel only.
Please match the fasteners (screws, dowels) to the existing fl oor type. It should be observed that the
structural design of the subsurface is adequately dimensioned for the weight of the bathtub incl. fi lling
and person(s).
REQUIRED TOOLS
• Foot rule
• Pen
• Water lever
• Philips head and slotted screwdriver
• Silicone syringe
• Hexagon socket wrench (Allen key) 4 mm
• Jaw wrench 17 and 19 mm
PREPARATION
Clean of the fl oor.
Unpack the tubs and check the scope of delivery.
Remove accessories (levelling frame incl. adjustable feet, screws, etc.) from the package.
Use packaging material as protective base
BATHTUB CRONO 1.0
1. Place levelling frame to the provided place of installation on the fl oor and level it horizontally at the
height-adjustable feet by means of a water level.
2. Install pop-up and overfl ow set to the bathtub.
3. Fix the tap on the edge of the tub.
4. Place the bathtub on the levelling frame, adjust and screw it together. Adjust the bathtub
horizontally again with the water level,
if necessary.
5. Connect water and waste water.
6. Seal the joint between tub and wall with silicone, if applicable.
26