burgbad M1001 Instrucciones De Montaje página 31

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 98
BATHTUB CRONO 2.0/ INSTALLATION
1. Please extract the push rods to separate the levelling frame from the bathtub frame.
2. Place the levelling frame to the provided place of installation of the tub on the fl oor. The recess in
the levelling frame points to the tap support of the bathtub. Level the frame horizontally at the
height-adjustable feet by means of a water level and tighten it securely with screws.
3. Install pop-up and overfl ow set to the bathtub.
4. Place the bathtub over the levelling frame.
5. Connect the levelling frame to the bathtub by means of the push rods.
6. Install water and waste water connections
Installation of the panel (tap, waste)
Screw the white clips into the thread nuts below the tap support.
Assebmle bezel (consisting of 3 pieces) with the fi tting-clips.
Place the panel below the tap support and adjust it with the height-adjustable feet, if applicable.
Engage the clips of the panel to the counterparts below the tap support with slight pressure.
Silicone
We recommend sealing the joints around the foot of the tub and around the panel with silicone.
Height-adjustable feet of the
panel
Please mount the white clips into
the thread nuts below the tap
support
Panel below the tap support
GB
31

Publicidad

Tabla de contenido
loading

Tabla de contenido