Descargar Imprimir esta página

CAMBRIDGE Fully Assembled Manual De Instrucciones página 4

Ocultar thumbs Ver también para Fully Assembled:

Publicidad

Tools Required for Fireplace Kit Installation:
Skid steer loader or other type of machinery with
forks capable of lifting 4000 lbs.
Safety Goggles
Ear Protection
Dust Mask
Gloves
Shovels (digging & flat)
Metal Cutters for banding on cubes
Mason Hammer (chipping, hammer)
Road Stone Rake
Tamper (Hand or Mechanical)
Wheelbarrow
Level (2' and 6' recommended)
Speed Square
Caulk Gun 10 oz or 28 oz (depends on what size
adhesive is purchased)
Rubber Mallet
14" Demo saw with diamond blade
Tape Measure
Marking Device (pencil, soap stone, etc)
Chalk Line
Hand Broom
Concrete Tools (Trowel/Floats)
6 Foot ladder or scaffold according to your company's
state, and OSHA safety policy
Drill & 1/16" bit
5/16" nut driver
7 ¼" Circular saw with wood blade
4" Electric grinder
4" Diamond cup grinder
Cambridge Fully Assembled
Items Included in the Fireplace Kit:
1 - Fireplace unit top
1 - Fireplace unit bottom
1 - Fireplace Hearth
2- Forklift protectors
2 – Bullnose Filler Pieces
4—Filler block
1 - Installation manual
Material Required:
¾" clean stone (approx. 1 ton)
Concrete (approx. 32-80 lb bags)
Cambridge concrete adhesive
approx. 6 (29 oz.) or 17 (10.3 oz.) tubes
(4 pcs) 2" x 4" x 8' lumber
2 ½" wood screws
½" rebar (approx. 15')
3
Outdoor Fireplace

Publicidad

loading