Checking The Functions - Gobius 4 Waste Instrucciones De Montaje

Monitor de depósitos
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 53
Installing and connecting the device
z European standard: 10 – 180
page 6)
Filling level
0
¼
½
¾
Key to the cicuit diagrams fig. 7, page 5 and fig. 8, page 6:
Item
Meaning
1
Battery
2
Fuse (500 mA)
not included in the supply
3
Extra gauge
4
Resistor (24 V only)
not included in the supply
5
Lamp (above ¾ level)
6
Lamp (below ¼ level)
7
Control unit
6.5

Checking the functions

➤ Switch on the power supply.
✓ The LEDs flash one after the other on the control panel.
If the LEDs do not flash, press the
(fig. 2 5, page 3).
✓ Gobius starts a function test. Each LED flashes simultaneously with the
blue LED.
✓ Once the green, yellow and red LEDs light up, the test has been success-
fully completed.
28
/US standard: 240 – 33
European standard
10 – 80
23
68
112
158
Gobius 4 Waste
USA standard
240 – 33
214
161
109
56
button on the control panel
(fig. 8,
EN

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

970442

Tabla de contenido