Drain Joint Installation; Start Up And Performance Testing - AUX AMW-NFH Serie Manual De Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5. Drain joint installation

6 . Start up and performance testing

Prior check s
-
Measure the voltage supply and make sure it is within the specified range.
-
Testing must be performed in all modes of operation.
-
To operate in cool mode, press the ON/OFF button of the remote controller to place the unit in
cooling mode and select a temperature below room temperature.
-
To operate in heat mode, press the ON/OFF button of the remote controller to place the unit in
heating mode and select a temperature above room temperature.
-
You can also check the manual button. This is used when you do not have the remote controller and
and is located under the front panel.
49

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

R32

Tabla de contenido