6. Remove the adhesive tape so the elastic band from the floor profile is at the exterior of the
cold room, facing upwords.
7. Finish and accesories:
7.1. Insert all caps for ceiling and walls from inside the cold room.
7.2. Install the coving section and any other accesories (Optional).
7.1
7.2
Coving Section
White Plastic Cap
6
Adhesive Tape
EN