Installation Instructions; Transport Instructions - Solcrafte 200 Instrucciones De Montaje

Ocultar thumbs Ver también para 200:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

EN

Installation Instructions

F
ES
I
General Installation and Transport Instructions
Installation, maintenance and cleaning may only be carried out by qualified firms. Only qualified firms are to carry out the procedures de-
scribed in these instructions. The materials supplied must be used for installation. Familiarise yourself with the applicable local standards
and regulations before mounting and starting up the Solcrafte system. The hot water system may not be lifted by the connections or screw
threads. Avoid impact to and mechanical effects on the hot water system, particularly the solar glass, back wall and pipe connections.
The manufacturer is not liable for structural damage or damage to devices, etc. resulting from improper installation.
Structure - flat roof
Installation may only be carried out on roof surfaces or sub-structures with sufficient load bearing capacity. The structural load bearing
capacity of the roof or substructure must be tested in terms of local and regional conditions by a structural engineer before installing the
Solcrafte system. During inspection, particular attention should be paid to the quality of the substructure for retaining screw connections
used to secure installation equipment for the Solcrafte system. Inspection of the entire installation structure in accordance with DIN EN
1991-1-3, 4 or country-specific regulations is particularly necessary in areas with heavy snowfall (note: 1 m
wet snow ~ 200 kg) or high wind speeds. The inspection should also take into account any particularities of the installation location (foehn
wind, air jets, eddies etc.) that can lead to increased load. When choosing the installation location, make sure that maximum loads are not
exceeded by snowfall or wind forces. There must be at a distance of at least 1 m to the roof ridging or edge.
Note:
Installing a Solcrafte system means changing the structure of an (existing) roof. Extended and inhabited lofts or inadequate mini-
mum roof inclinations often require (in terms of roofing) additional measures carried out on-site e.g. sarking, to secure against water
penetrating as a result of wind pressure and drifting snow. For larger systems, it is recommended to secure sarking on a separate mount
construction of steel bars. Using concrete ballast blocks and cable bracing as a means of securing system components protects the roof
membrane from being perforated during installation. Rubber mats should be used if necessary to increase the static friction between the
roof and concrete ballast block and avoid damage to the roof membrane. For additional security against peak wind loads, steel cables of a
suitable thickness (typically 5 mm/minimum tensile strength 1450 N/mm
Structure - sloped roof
Installation may only be carried out on roof surfaces or sub-structures with sufficient load bearing capacity. The structural load bearing
capacity of the roof or substructure must be tested in terms of local and regional conditions by a structural engineer before installing the
Solcrafte system. During inspection, particular attention should be paid to the quality of the substructure for retaining screw connections
used to secure installation equipment for the Solcrafte system. Inspection of the entire system installation in accordance with DIN EN
1991-1-3, 4 or country-specific regulations is particularly necessary in areas with heavy snowfall (note: 1 m
wet snow ~ 200 kg) or high wind speeds. The inspection should also take into account any particularities of the installation location (foehn
wind, air jets, eddies etc.) that can lead to increased load. When choosing the installation location, make sure that maximum loads are not
exceeded by snowfall or wind forces. There must be a distance of at least 1 m to the roof ridging or edge.
Lightning protection/ equipotential bonding for the building
According to the current lightning protection code EN 62305, parts 1 - 4, as well as country-specific regulations, the Solcrafte system may
not be connected to the building lightning protection. A safety distance of at least 1 m to a conductive object, preferably to the side, must
be maintained. For installations on on-site metal sub-structures, authorised electrical lighting protection specialists should be consulted.
The metal tubes of the Solcrafte system and all housing parts or fixing elements must be connected to the main potential equalisation bus
bar by an authorised electrical specialist in accordance with the country-specific standards.
20
SOLCRAFTE – SOLAR DESIGN SOLUTIONS
) are required.
2
powder snow ~ 60 kg / 1 m
3
3
powder snow ~ 60 kg / 1 m
3
3

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

150100

Tabla de contenido