Descargar Imprimir esta página

Arrow AK4 Manual De Instrucciones

Juego de barrena de anclaje

Publicidad

Enlaces rápidos

WU01
ARROW
AUGER ANCHOR KIT
NECESSAIRE D'ANCRAGE AVEC MECHE TORSE
DREHHAKEN ANKERBAUSATZ
JUEGO DE BARRENA DE ANCLAJE
MODEL
AK4
MODELE
697.60298
MODELL
MODELO
704950309
It is important that the entire
floor frame be anchored after
the building is erected.
II est important d'ancrer le bâti
du sol après avoir érigé l'abri.
Es ist wichtig, den gesamten
Bodenrahmen nach der Mon-
tage des Gerätehauses zu
verankern.
Es importante sujetar todo el
entramado del piso después
que se ha erigido el cobertizo.

Publicidad

loading

Resumen de contenidos para Arrow AK4

  • Página 1 WU01 ARROW It is important that the entire floor frame be anchored after the building is erected. II est important d'ancrer le bâti du sol après avoir érigé l'abri. AUGER ANCHOR KIT Es ist wichtig, den gesamten NECESSAIRE D'ANCRAGE AVEC MECHE TORSE Bodenrahmen nach der Mon- tage des Gerätehauses zu...
  • Página 2 WU02 STEP 1 ETAPE 1 1. SCHRITT PASO 1 CAUTION: Determine location of ALL underground utilities, (electric, water, sewer lines, telephone, cable, TV, etc.), to prevent accidental puncture. ATTENTION: Etablissez l'emplacement de TOUS les services publics souterrains (électricité, eau, égouts, téléphone, télévision par câble, etc.) pour éviter les ruptures accidentelles.
  • Página 3 WU03 A. SUGGESTED ANCHOR LOCATION F. APPROX. 5" - 9" (12,7cm - 22,9cm) B. 1ST RIB G. 5' x 4' through 10' x 9' (1,5m x 1,2m - 3,0m x 2,7m) C. ROOF H. 10' x 12' through 12' x 17' (3,0m x 3,7m - 3,7m x 5,2m) D.
  • Página 4 WU04 STEP 2 ETAPE 2 2. SCHRITT PASO 2 A. Install anchors by pushing down on eye and turning. The use of a large screwdriver, 12" (30,5cm) length of pipe or rod will permit you to screw the anchor into the earth. Drive each anchor into the earth so that approximately 3" (7,6cm) extends above the ground level.
  • Página 5 WU05 STEP 3 ETAPE 3 3. SCHRITT PASO 3 A. Take end of cable and insert under roof panel at rib, over the side wall angle, and roof beams as shown. A. Prenez l'extrémité du câble et insérez sous le panneau de toit à la nervure, par-dessus la cornière supérieure latérale et les poutres de toit, de la manière illustrée.
  • Página 6 WU06 STEP 4 ETAPE 4 4. SCHRITT PASO 4 A. Insert approximately 4" to 6" (10,2cm - 15,2cm) of cable through eye of anchor, assemble cable clamps as shown in Detail Drawing. A. Insérez environ 10,2cm à 15,2cm (4" à 6") de câble à travers l'oeillet de l'ancrage, montez les brides de câble de la manière illustrée dans le dessin détaillé.
  • Página 7 WU07 NOTE: If you live in an area which is subject to winter frost, periodic inspection of the anchoring cables for tautness is recommended. If the cable is loose, turn anchor clockwise, if it becomes too tight, turn the anchor counter-clockwise. NOTE: Si l'abri est utilisé...
  • Página 8 WU08 704950309...

Este manual también es adecuado para:

697.60298