5.
Now the roof construction can be lifted onto the ridge element and threaded into the corner posts, and
screwed together. Depending on the number of persons (at least 4), mechanical support is necessary in the
form of a yard loader or forklift truck. Please make sure that the fork of the loader is only placed under
the cross struts and not directly at the lower edges of the roof sheets, to avoid damage from bending. Fork
extensions or a large pallet could help to make this process easier.
4x hexagon head screw M10 x 65
4x nut self-locking M10