RECIRCULATION VERSION AIR OUTLET
• Assemble the two halves of the hood body extension piece 14.
• Push fit the assembled hood body extension piece 14 onto the
air outlet.
• Push fit connection 15 onto the hood body extension piece 14.
• Insert the connection extension pieces laterally 14.1 in connec-
tion 15.
• Make sure that the outlet of the extension pieces 14.1 is hori-
zontally and vertically aligned with the chimney outlets. If this
is not the case, adjust the position by either reversing the con-
nection extension pieces 14.1 or by cutting the hood body ex-
tension 14 along one of the thinner section channels denoting
the pre-fixed lengths, then reassemble as described previously.
• The air outlet directional grills 8a - 8b must be fitted after the
lower outlet duct has been installed.
• Ensure that the activated charcoal filters have been inserted.
ELECTRICAL CONNECTION
• Connect the hood to the mains through a two-pole switch hav-
ing a contact gap of at least 3 mm.
• Remove the grease filters (see paragraph Maintenance) being
sure that the connector of the feeding cable is correctly inserted
in the socket placed on the side of the fan.
Upper exhaust flue
• Slightly widen the two sides of the upper flue and hook them
behind the brackets 7.2.1, making sure that they are well
seated.
• Secure the sides to the brackets using the 4 screws 12c (2,9 x
9,5) supplied.
Lower exhaust flue
• Slightly widen the two sides of the flue and hook them be-
tween the upper flue and the wall, making sure that they are
well seated.
• Fix the lower part laterally to the hood body using the 2 screws
12c (2,9 x 9,5) supplied.
• On the recirculation version, fit the directional grids 8a – 8b in
their housings making sure that the directional symbols are to-
wards the top and front of the hood. Also make sure that they
are correctly inserted in the connection extension pieces 14.1.
EN
Flue assembly
15
14.1
8b
14
7.2.1
2.1
2
8b
2.2
8a
12c
8a
12c
1 15