PROPANE CONSTRUCTION HEATER
1. Remove heater from carton.
2. Remove all protective packing applied to heater for shipment.
3. Retain cartons and packaging material until unit is operated and found in good condition.
4. Check heater for any shipping damage. If heater shows any external or internal
damage, promptly inform dealer/distributor where you purchased heater.
Assembly Components and Instructions for Steel Base Units:
Tools required for assembly:
Adjustable Wrench
Phillips Head Screw Driver
1. Assembling the Cord Wrap Attachments:
Parts Required:
4 Screws (ST3.5x10),
and 2 Cord Wrap Attachments
Place the cord wrap attachment
as shown, then use Phillips
screwdriver to tighten the
screws and secure the
cord wrap attachments.
2. Regulator and Hose Connection:
See figure on right.
Connect the hose tightly to
the heater using a wrench.
Please also refer to
page 7 in the manual.
NEVER LEAVE THE HEATER
UNATTENDED WHILE BURNING!
UNPACKING HEATER
Contents:
Unit, Manual, Hose and Regulator
2 Cord Wrap Attachments, 4 Screws (ST3.5x10)
Tighten, clockwise,
use a wrench
Assembly Time:
Assembly
5 Minutes
Hose Assembly
5