BRÖTJE NEOP 300 Instrucciones De Montaje página 23

Ocultar thumbs Ver también para NEOP 300:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 54
Fig. 4: Installation in the brackets
Fig. 5: Fastening the pump
7311618-02 08.13
9
7
8
5. Floor installation: Fasten the brackets (7) at a suitable position on the floor
with anchors and screws and stick the neutralisation pipes in the brackets.
Floor installation with direct introduction into a condensate pump: Screw in-
stallation heightening (8) a Fig. 4 ccording to under the brackets (7); fasten the
brackets with the installation heightening at a suitable location on the floor
with anchors and screws and stick the neutralisation pipes in the brackets
Wall installation Fasten the brackets (7) at a suitable location on the wall with
anchors and screws, stick the neutralisation pipes in the brackets (7) and secure
with clips
10
11
6. Fasten the pump (10) with Velcro strips (11) on the neutralisation pipes ( Fig. 5 ,
left)
Risk of electric shock! To eliminate a backflow of condensate into the pump, it
must always be attached above the neutralisation ( Fig. 5 , lower right)!
Neutralisation unit NEOP 300
9
7
8
Assembly
GB
23

Publicidad

Tabla de contenido
loading

Productos relacionados para BRÖTJE NEOP 300

Tabla de contenido