Installation
GB
5. Drain line of the neutralisations unit ( Fig. 3 , pos. 5) place with downward slope
to the house drainage (or connect with the condensate lift unit)
Caution! Inlet and outlet lines must be laid with continual downward slope! If no
free drain is possilbe, a condensate lifting unit must be used!
6. Check all connections for leaks
7311617-02 08.13
Neutralisation unit NEOP 70
17