Electric Installation - BRÖTJE HEP 25-180-10 Manual De Montaje

Ocultar thumbs Ver también para HEP 25-180-10:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 58
Installation
GB

3.5 Electric installation

Fig. 4: Connection diagram
24
- Plug the mains plug into the pump power supply socket (see Fig. 1 )
- Plug the PWM cable into the pump PWM socket (see Fig. 1 )
- Connect the power cable according to Fig. 4 at output 230 V (mains power out-
put) in control unit LMS
- Connect the PWM cable according to Fig. 4 at output P1 (PWM control output) in
control unit LMS
Note: For external installation, use the fittings supplied to install the connecting
cables in the boiler.
Variable speed pump HEP 25-180-10
7303554-03 08.12

Publicidad

Tabla de contenido
loading

Tabla de contenido