6. Bearing Lubrication
Les roulements de cette unité sont des roulements celles qui contiennent un lubrifiant suffisant
pour durer toute sa vie. On ne requiert pas un autre type de lubrification.
7. Start up Procedure
7-1. Check to see that nuts and bolts are all snug, this must be done, as some fasteners may
become loose in transit.
7-2. Check that compressor is on a strong, stable level base.
7-3. Check that air filter is clean.
7-4. Do not place any materials on or against the belt guard, or the compressor unit.
Obstacle materials will limit the cooling effect and could lead to premature failure.
7-5. Open the air receiver outlet valve and start the unit for no load operation. Allow the unit
to operate for a minimum of twenty minutes in no load condition.
7-6. After running the compressor for twenty minutes, close the valve and allow the unit
to reach maximum operating pressure. Ensure that the compressor shuts down at the
preset maximum pressure and the head pressure is released through the pressure
switch.
7-7. Check the air compressor and piping systems for leakages and correct as required.
7-8. Shut off all power to the air compressor before attempting any repair or maintenance.
8. Maintenance Check List
Before doing any maintenance or adjustments to your air compressor, the following safety precau-
tions should be taken.
(1) DISCONNECT ELECTRICAL POWER
(2) MAKE SURE NO AIR PRESSURE IN AIR RECEIVER
8-1. Daily checklist
8-1-1. Drain condensation from air receiver tank.
8-1-2. Check for any unusual noise or vibration.
8-1-3. Be sure all nuts and bolts are tight.
8-2. Weekly checklist
8-2-1. Clean air filter, replace if necessary.