PRELIMINARY INSTALLATION INSTRUCTIONS
Wall-mounted installation
The water demineralizer should be fitted in a vertical position either beneath a sink or in a cabinet. For
mounting, use the supplied dowels and screws. Install on the wall leaving a space of at least 10 cm from
the floor or the bottom surface so that the cartridge holders can be dismantled.
Figure 3 – Overall dimensions
Power Supply
The unit is supplied with 240 Vac by means of a transformer which complies with the applicable electrical
safety requirements of the Standards Institutes.
The maximum power absorbed is 40W.
Hydraulic installation
Drain
Install a drain nearby to dispose the wastewater discarded by the osmotic membrane
(max 1.5m)
WB Valve
The safety valve (Water Block
return of water into the hydraulic system and possible consequent contamination. For
this purpose, the WB valve must be fitted in a vertical position (refer to the
instructions at the end of this manual).
Charge
The installation of the product with incoming water pressure above 3 bars, can
drastically reduce the lifespan of all the cartridges and especially of the osmotic
membrane. If this is the case, the installation of a reducer to bring the pressure to less
than 3 bars is recommended.
Osmo
When the storage tank is full of
water, it weighs approximately
13kg. Check that the work surface
supports this weight.
®
) is fitted with a special one-way valve which prevents the
9