6. Set the DIP switches to meet system requirements.
Switch Label
1
Non-HP / Heat Pump
2
Normal / Dual Fuel
3
Rev Valve B/O
4
Fan Gas / Elec & HP
5
Opp Call 20 / 15
6
Lockout None / Active
7
Priority All / Zone 1
8
G2 W/2-Zones / 2 Stages
5

System Checkout

After the wiring and configuration is complete, use the following checklist to verify the panel operation
is correct.
[
]
Make sure the Emergency Heat Switch is in the Off (right) position.
[
]
Open jumper J2 by moving cap from both pins to only one pin.
[
]
Use table and diagram in section 4 of this installer guide or inside the zone panel cover to
verify DIP switches are set properly.
[
]
Make sure the supply temp sensor is wired to terminals SA1 and SA2. The zone dampers
will not close if the supply sensor is missing.
[
]
Make sure no zones are calling by turning off all thermostats.
[
]
Apply 24 VAC power to the panel.
Function
Set to NON-HP for conventional equipment. Set to HEAT PUMP for
heat pump equipment.
Heat pump 1st stage lockout when 2nd stage calls
O/B terminal active in heating (B position) or cooling (O position)
Fan controlled by HVAC system or panel
Opposite call answer time in minutes
2nd stage lockout without 2 zones calling
Changeover priority zone 1 or first call
2nd stage fan activation requires 2 zones or 2 stages
9
NON HP
NORMAL
REV VALVE B
FAN GAS
OPP CALL 20
LOCKOUT NONE
PRIORITY ALL
G2 W/2-ZONES
HEAT PUMP
DUAL FUEL
O
ELEC/HP
15
ACTIVE
ZONE1
2-STAGES