Important; Supplies Required; Pre-Installation Information - Bradley S19-670 Manual De Instalación

Depósito de 5 galones con manguera de aspersión
Ocultar thumbs Ver también para S19-670:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

S19-670
Read this installation manual completely to ensure proper installation, then file it with the
Installation
owner or maintenance department. Compliance and conformity to drain requirements and
other local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before discarding
Packing List
any packaging material. If any parts are missing, do not begin installation until you obtain
IS
T H
E
S ID
U P
the missing parts.
The inspection and testing results of this equipment should be recorded weekly to verify
proper operation. This equipment should be inspected annually to ensure compliance with
ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be trained
regarding the placement and proper operation of emergency equipment per ANSI Z358.1.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY
FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
100˚ F
This unit is to be used with tepid, potable water as defined by ANSI Z358.1. (Note: avoid
prolonged exposure to ambient heat sources above 100° F, or below 60° F).
60˚ F
NOTICE! Avoid cleaners containing organic solvents, alcohols, and hydrocarbons.
Rinse with water after cleaning.

Supplies Required:

• Pipe sealant
• Air pressure equipment or supply (clean and free of oil and contaminants) capable of up to 100 psi
• Sign-mounting hardware
• Adjustable wrench
2
netzerotools.com

IMPORTANT

10/19/2012
netzerotools.com
Installation

Publicidad

Tabla de contenido
loading

Tabla de contenido