PRG UNV Manual De Instalación, Funcionamiento Y Servicio página 9

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

• Always use an assistant or mechanical lifting equipment to safely lift and position the projector.
Slide connection block with projector into projector mount assembly (A) as shown. Push in and tighten captive screw
7
to secure projector to projector mount assembly (A).
ARROW
INDICATES
FRONT OF
MOUNT
8
IMPORTANT: For security installations, insert one #10-32 x 1/4" socket pin screw (E) through projector mount
assembly (A) and into connection block as shown. Tighten screw with 4mm security allen wrench (I).
FRONT OF MOUNT
A
E
WARNING
CAPTIVE SCREW
A
CONNECTION BLOCK
CONNECTION BLOCK

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Unv-sUnv-w

Tabla de contenido